Milender White completed tower modifications including steel fabrication and installation of horizontal and diagonal reinforcements to this self-supporting communication tower within a 25 day turnaround.
Working with the engineer of record on a value engineered solution we converted welded leg reinforcement to fully non-welded horizontal and diagonal modification. The non-welded solution eliminated the welded split pipe reinforcing design and replaced it with a bolted sub-horizontal and sub-diagonal modification.