This project involved a complete occupied renovation of 476 apartment units located near Mile High Stadium. The apartment complex was originally built in 1967 and desperately needed cosmetic improvements.
Working in close proximity to residents presented several logistical and safety challenges. Scheduling electrical shut downs, elevator upgrades, interior demolition, window replacement and other construction activities required close communication with the leasing staff and residents. The complete project consisted of townhomes (125,000 sq. ft.) and the mid-rise (262,000 sq. ft.)