Milender White worked as an associate partner with KPS Electric in the construction of this 30,255 sq. ft., state-of-the-art dining hall at this U.S. Army post near Colorado Springs. The facility includes a 10,000 sq. ft. kitchen which serves more than 1,000 soldiers three meals per day. The building itself is constructed of structural steel and load-bearing masonry and utilizes both a vaulted atrium area and storefront to allow natural light to fill the facility.