Skip to Main Content
Our Work

Parkside @ City Center

14531 E Alameda Ave.
Aurora, CO

Type: Development, Multi-Unit Residential, Prefabrication, Retail

Owner: Parkside Aurora, LLC

Architect: Oz Architecture & G3 Architecture

Project Summary

Milender White (MW) co-developed and built this 216-unit multifamily transit-oriented development with 36,000 sq. ft. of storefront retail. The mixed-use building is a five-story wrap, Types III and Type V-B construction with structured parking and a concrete podium over ground-floor retail space; plus three stand-alone retail buildings.

The Parkside Collective apartment community offers residents a unique experience relative to the “typical” apartment communities that are found outside Denver’s downtown core.  Resident units boast quality appliances and millwork, luxury vinyl flooring and solid-surface counters in highly efficient floorplans.  In addition to contemporary finishes, secured garage parking and extensive community amenities, Parkside residents enjoy the extended amenity set offered via the 36,000+ square feet of on-site retail space, including “Parkside Eatery”, a micro food hall with 5 food and beverage concepts surrounding a central bar/common area.

The development site is at the northeast corner of Sable Boulevard and Alameda Avenue, adjacent to a 19-acre city park with a pedestrian underpass connecting residents to RTD’s Aurora Metro Center Station.  The MW team partnered with Xcel and RTD to coordinate moving an RTD power line to support construction; and utilized prefabricated walls and floors on the project to reduce cost and increase site safety and efficiency.

Parkside @ City Center and Milender White Construction were the recipient of the Associated Builders & Contractors, Inc., Rocky Mountain Chapter’s 2021 General Contractor Project of the Year and 2021 Excellence in Construction, Multi-Family / Residential awards. Parkside is the recipient of the Award of Excellence for Special Projects from the Rocky Mountain Associated Builders & Contractors, Inc. (ABC).

Prefabrication: MW constructed and installed pre-fabricated walls and floors on the project which drove reduced costs and increased safety and efficiency on site.

Watch our prefab video here!

 

Learn more about the Ribbon Cutting Ceremony here!

Learn more about the Ground Breaking here!

 

Related Projects

Our Work